Anyway, the reason I took the day off and read instead of knitted is because the jaywalker was on a timeout. The other night, I was knitting along, watching The Bourne Identity with Mr. Interrupted when I looked down and saw a hole. (When am I going to remember that I am supposed to be a knit blogger and that this is exactly the sort of thing I should be taking pictures of?) It was a massive hole surrounded by random, free-form decreases--I must have been tired. It was a mess, and I had to put the Jaywalker on a timeout while I thought about how to fix it.
I really did not want to rip back the sock, even a few rounds because, while I am capable of picking up the stitches, I find it incredibly tedious and didn't feel like doing it. So this morning I started out by dropping the FUBAR stitches (it was three rounds' worth).
Then, I took out my crochet hook and extra size zero needles and I started knitting up the dropped stitches.
I had to do a triple decrease instead of a double when I got to the top, but I think it'll be OK. The intended recipient of these socks won't notice.
I'm feeling a little tickled with myself, even though I'm positive I'm not the first knitter to fix a mistake this way. Now I can keep on knitting. At least until July 21st when I will probably end up reading instead of knitting.